Why the first charger should not set the building’s future
An owner asks for an EV charger. The request looks local: one bay, one vehicle, one cable route. But in an apartment building, it can create a precedent for common-property access, electrical capacity, billing, safety, maintenance and the next owner’s request.
That is why the most credible question for a strata committee is not “Which charger should we approve?” It is “What is the lowest-regret path from today’s demand to the building we will need in three years?”
NSW’s EV-ready strata guidance starts with five steps: survey, energy assessment, evaluate options, develop a strategy and implement.[1] That sequence is practical because it turns an emotionally charged individual request into a documented building decision.
Step 1: Measure the demand you have—and the demand you can see coming
A short, neutral resident survey is more useful than guessing from the number of EVs currently in the carpark. NSW recommends using a survey to understand tenant and owner needs, attitudes, timing and likely infrastructure scale.[1]
Ask about:
- current EV ownership and vehicles on order;
- expected adoption over 12, 24 and 36 months;
- allocated, visitor and accessible parking requirements;
- whether residents expect private, shared or managed charging;
- likely charging windows; and
- willingness to participate in a staged building approach.
The survey does not establish electrical capacity. It creates a demand brief for the assessment and helps the committee distinguish a one-off exception from a repeatable programme.
Step 2: Treat energy capacity as the decision gate
Before approving hardware, commission a building energy/readiness assessment. NSW says this assessment should consider existing circuit-breaker sizes, historical peak loads, energy-use patterns, potential efficiency actions and spare electrical capacity.[1]
The Commonwealth’s guidance describes three useful outcomes:[2]
| Readiness result | What it means in practice | The next question |
|---|---|---|
| EV ready | The building has sufficient infrastructure, including a dedicated EV distribution board, to support chargers | What rollout, billing and load-management rules make access fair? |
| EV capable | There may be adequate capacity, but wiring or enabling works are needed | Which enabling works give the best staged pathway? |
| Insufficient | Electrical upgrades are required before normal charger deployment | What is the upgrade pathway, and can demand controls or staged works form part of it? |
A result should be evidence-led. It is not a reason to promise that every resident can immediately install at their preferred charging rate. Building diversity, peak profiles, cable routes, fire/safety requirements, switchboard condition and future equipment all matter.
Step 3: Choose the rollout model—not just an individual charger
There is no single correct model. NSW notes that individual approaches can suit an early request in smaller buildings where resident meters are accessible. It also cautions that long cable runs can be difficult and costly, one-off works may not prepare the building for future installs, and each request can add to peak demand.[1]
Three planning models usually deserve comparison:
Model A: Individual installations
An owner funds a charger for their own bay, generally with an approval pathway that deals with common property, routing, ownership, power source, maintenance and eventual removal or transfer.
Best considered when: demand is genuinely low, meters are accessible and the building has a documented way to manage the next similar request.
Model B: Shared or owners-corporation infrastructure
The owners corporation develops a common backbone, distribution or shared-charging solution. It can create a consistent design and future connection points, but it needs governance: who owns equipment, who pays, who maintains it and how energy use is allocated.
Best considered when: many residents are interested, the building needs a common-property solution, or the committee wants one technical standard rather than a patchwork.
Model C: Staged infrastructure with managed charging
The building completes enabling works and introduces chargers in planned phases. Management controls can help operate a group of chargers within the building’s designed demand constraints. The final specification must be designed for the building—not inferred from a generic “smart charger” label.
Best considered when: the building is expecting growth but wants to align capital expenditure with demonstrated demand.
Step 4: Put governance on the same page as the cabling
A technically sound installation can become a management problem if responsibility is unclear. Before works are approved, ask the strata manager, committee and advisers to document the operating rules.
| Decision to record | Why it matters later |
|---|---|
| Common-property approval pathway and by-law/legal advice where required | Makes approvals repeatable and defensible. |
| Ownership of chargers, cabling and enabling infrastructure | Clarifies handover, transfer, repair and removal responsibilities. |
| Electricity source and billing method | Avoids an informal subsidy or unexplained common-power cost. |
| Access, visitor use and parking rules | Connects charging operations to carpark governance. |
| Maintenance, fault response and equipment warranty contact | Prevents a charger becoming an orphaned asset. |
| Data, network and cyber responsibilities for managed equipment | Makes ongoing platform and access controls visible. |
The Commonwealth recommends working through the owners corporation and strata manager, and it notes that tenants need landlord approval to proceed through the owners-corporation process.[2] This article is general information, not legal advice; obtain project-specific strata, insurance and safety advice for the building.
Step 5: Design safety and load management into the programme
Load management is not a slogan for a tender. The Commonwealth guide says multiple-charger projects should use appropriate load-management systems to support the safety and stability of the building’s electrical system.[2]
In a proposal, ask for a plain-English explanation of:
- the electrical capacity assumptions used;
- the number and ratings of chargers considered now and in each future phase;
- how demand is monitored or controlled;
- what happens when other building loads are high;
- whether solar, battery or other site assets were merely recorded or actually modelled;
- the network, communications and failure-mode approach; and
- the acceptance testing, labels, manuals and ongoing-support plan.
A load-management system may constrain charging under certain building conditions. That behaviour needs to be understood and accepted in the governance model—not discovered after residents have purchased EVs.
A committee-ready 90-day start
A structured start can be modest and still professional:
| Window | Action | Useful output |
|---|---|---|
| Weeks 1–2 | Resident survey and existing-document collection | Demand snapshot, available drawings/bills and governance contacts |
| Weeks 3–6 | Building readiness/energy assessment | Capacity, constraints and enabling-work findings |
| Weeks 7–9 | Compare at least two concept pathways | Scope, model, cost drivers, programme assumptions and risks |
| Weeks 10–12 | Committee/owner decision process | Agreed next phase, approval pathway and communications plan |
Cable Co’s Strata EV Approval Toolkit can help turn non-sensitive building inputs into a planning brief and discussion framework. It is not an electrical inspection, a legal opinion, a network approval, a fire-safety assessment or a promised charging outcome. For a building programme or portfolio review, use the Commercial Energy Assessment pathway.
Sources and review date
Reviewed 5 October 2026 using NSW and Commonwealth EV-ready building guidance. Strata law, insurance, fire requirements, connection requirements, charging technology and programme availability can change. Confirm the current written requirements for the particular building before contracting.