Free commercial pre-feasibility assessment
Commercial C.A.B.L.E. Method™ Energy Assessment
Screen energy spend, demand charges, interval-data readiness, commercial solar, BESS4/BESS5, critical-load resilience, electrical constraints and procurement readiness before issuing an RFP or requesting a product quote.
What the commercial assessment covers
- Current energy spend, tariffs, operating hours, peak demand and demand charges
- Existing solar, roof/carpark/land, switchboard, transformer and network constraints
- Indicative BESS4/BESS5 capacity pathway, critical loads, backup duration and controls readiness
- HVAC, process heat, refrigeration, hot water and fleet electrification
- Budget, decision stakeholders, timeline, procurement stage and RFP status
What the PDF report provides
The report provides an opportunity/readiness score, modelling confidence, indicative BESS pathway, demand and asset observations, a due-diligence checklist and a procurement action sequence.
Important: the output is an indicative pre-feasibility screen, not engineering design, finance approval, accredited-provider eligibility confirmation or an investment-grade business case.
Commercial energy assessment FAQs
Does the assessment confirm BESS4 or BESS5 eligibility?
No. It provides an indicative screen. Current PDRS rules, eligible products, accredited-provider requirements, planning and network approvals must be confirmed before reliance.
What data should a commercial property provide?
Provide twelve months of interval data, tariffs, peak demand, demand charges, NMIs, electrical drawings, critical-load details and current procurement requirements where available.