NSW decision-support tool
Split-System Air Conditioning Planning Tool
Split-system capacity and installation scope depend on the room, layout, insulation, windows, orientation, access, pipe route, drainage, electrical supply and selected model. This tool provides a preliminary scope prompt; a qualified site assessment confirms the equipment, compliance pathway, inclusions and price.
Reviewed 2026-10-16 by Cable Co editorial team.
Method
The tool begins with capacity and installation-scenario assumptions. Room area alone is not a design method. A final recommendation requires the actual space, heat load, layout, insulation, glazing, orientation, pipe route, drainage, access, electrical supply and model documentation.
What this tool cannot confirm
- Room-area guides are starting points only; they do not replace a heat-load and site assessment.
- Electrical, refrigerant, drainage, access and bracket or wall requirements vary by property and selected unit.
- Any displayed package is an indicative Cable Co planning estimate and does not confirm model, price, availability, warranty or compliance scope.
Primary sources
Requirements and programs can change. Check the current source for the proposed project.
Frequently asked questions
Can room area alone choose a split-system size?
No. Room dimensions are a starting point. Ceiling height, insulation, windows, orientation, layout, climate, occupancy and connected spaces can all change the required capacity.
What is a back-to-back split-system installation?
It normally describes an indoor and outdoor unit placed on opposite sides of a wall, creating a short pipe route. Site access, wall construction, drainage, electrical work and exact equipment still need to be checked.
Will a split system need electrical work?
The required supply, protection, isolation and circuit work must be assessed for the specific appliance and property by appropriately licensed personnel.
What should a site-specific quote show?
Ask for the exact model, capacity basis, pipe-route allowance, access and drainage assumptions, electrical work, exclusions, warranty issuer/conditions, commissioning and the price validity period.